SHADING DEVICE AND MULTIFUNCTIONAL STORAGE CONSTRUCTION
Design Studio - Part A
APRIL 15th: FIRST WALLS OF THE STORAGE
Design Studio - Part A
Site model |
FOLLOW UP:
MARCH 22nd: Link: MODULAR DESIGN CONSTRUCTION- FIRST ATTEMPT
APRIL 8th: BEGINNING OF THE CONSTRUCTION ON SITE
- Rebuild the retaining wall that spans the change of level between the storage site and the lower level.
- Leveling the ground
- Storage foundation: pallets + debris
Test the stones' disposition |
Hands on |
Finding appropriate stone size |
Wall composed of local stones and portland cement |
The retaining wall
|
Leveling the ground
|
Storage foundation: 2 pallets + debris + sand |
Storage's base almost completed.
Photos by Nora Arias
|
- Raising the last part of the retaining wall
- Build up the first module
- First walls
Storage foundation (Photo by Shan Jin) |
Reinforcement of the base and wall. Addition of wooden
board to the sides to prevent the debris of the
foundation sliding out of the base.(Photo by Maria Solé)
|
First level of the back wall. (Photo by Shan Jin)
|
Second level of the wall (Photo by Shan Jin)
|
Module construction. Fixation with screws. (photo by Shan Jin)
|
The first module built. Pallets, screws and small steel plates
(Photo by Maria Solé) |
Re-leveling the base. It needs to be horizontal to incorporate the door.
(Photo by Shan Jin) |
No comments:
Post a Comment